Construction Estimating Services

Built for US Projects

Professional quantity takeoffs, bid proposals & cost budgets for US contractors, developers & design-build firms — RS Means benchmarked, CSI MasterFormat, NDA-protected.

Why Clients choose my services

24–48 Hour Delivery

Rush 12-hr option available

RS Means Benchmarked

City cost index adjusted

CSI MasterFormat

Divisions 1–48, USD only

NDA on Request

256-bit SSL file transfer

5-Star Fiverr Rated

30+ Projects Delivered

✓ 98% Bid Accuracy

✓ 24-48 Hr Delivery

✓ RSMeans Benchmarked

✓ CSI MasterFormat

✓ NDA Available

✓ 5★ Fiverr Rated

Services

Everything from Takeoff to Bid Package

📐

Quantity Takeoff

Material counts from PDF, DWG, or Revit. CSI-formatted Excel output with measurement backup.

24-48 Hrs Delivery

💰

Bid Proposal Preparation

Complete RFP-ready packages; scope, unit rates, labor/material breakdown, alternates list.

48-72 Hrs Delivery

🏗️

Pre-Construction Cost Budgeting

Pre-construction estimates from SD through GMP. RS Means city cost indices applied.

48-72 Hrs Delivery

📅

Project Scheduling (CPM)

CPM schedules in MS Project or Primavera P6. Baseline, look-ahead, and recovery plans.

48-96 Hrs Delivery

How it Works

4 Step Process - Start to Delivery

① Upload Drawings

PDF, DWG, Revit accepted

② Get Quote (2 hrs)

Fixed-price scope confirmation

③ We Estimate

Using RS Means & local data

③ We Estimate

24–48 hrs, Excel + PDF

$0M+

Value Estimated (USD)


0+

US Projects Completed


0%

Average Bid Variance

0hr

Average Turnaround


Not sure which service you need?

Upload your drawings and tell us your deadline — we’ll recommend the right service and scope it for free.

Why choose us

Build for the way US Construction Works

🌙

Overnight Turnaround

Upload at 9 PM EST, receive your estimate by 9 AM. I work while you sleep — so you never miss a bid deadline.

📐

Imperial Units, USD Only

All deliverables use SF, LF, CY, and USD. CSI MasterFormat divisions. No unit conversions, no reformatting.
 

📊

RS Means + City Cost Index

Pre-construction estimates from SD through GMP. RS Means city cost indices applied.

💵

Fraction of In-House Cost

A full-time US estimator costs $70K–$120K/year. Pay only per project — scale up or down with your pipeline.

🔒

Bid Confidentiality

NDA available before any drawings are shared. Files delivered via 256-bit SSL encrypted links only.
 

Written Accuracy Guarantee

Full-document estimates guaranteed within ±10% of your awarded bid. Miss the mark — revise for free.

Case Study Teasers

Real Projects. Real Accuracy.

Two of our recent US project outcomes — with full numbers.
Residential · Austin, TX
25-Unit Multifamily Development
RESIDENTIAL
$4.2M
Project Value
36 hrs
Delivered In
±6.8%
Bid Variance

Developer needed a CSI estimate before a lender presentation. Delivered full Division 3–16 with alternates within 36 hours. Accepted by lender without revision.

“Clean, well-organized — our lender accepted it without revision.” — [Client Name], Principal Developer · Austin, TX
Commercial Fit-Out · Chicago, IL
6,500 SF Medical Office Fit-Out
COMMERCIAL
$1.8M
Project Value
24 hrs
Rush Delivery
±5.1%
Bid Variance

GC uploaded drawings at 10 PM EST — full CSI estimate delivered by 10 AM. Bid submitted on time. Contract awarded within the guaranteed accuracy band.

“We would’ve passed on this bid. Instead, we won it.” — [Client Name], Project Manager · Chicago, IL

What US Clients Say

★★★★★
"Incredibly fast and accurate. I uploaded drawings on a Friday evening and had a complete estimate Monday morning. The CSI formatting matched exactly what our GC needed."
👤
[Client Name]
Real Estate Developer · Dallas, TX
★★★★★
"We use Humayoon for overflow estimating when our pipeline is full. The turnaround is reliable, the format is clean, and the pricing is a fraction of what we'd pay a local estimator."
👤
[Client Name]
General Contractor · Chicago, IL
★★★★★
"As an architect, I need cost feedback during design — not after. Humayoon gives me schematic-level estimates fast enough to keep the owner's budget on track throughout the design process."
👤
[Client Name]
Principal Architect · New York, NY

98%
BID
ACCURACY
GUARANTEE

Our Written Accuracy Guarantee

For full-document estimates with complete construction drawings: if your estimate deviates by more than ±10% from the awarded bid price, we'll provide a free revised estimate for your next project of equal or lesser scope — no questions asked.

Read Full Terms →
US Construction Cost Insights

Ready to Win Your Next Bid?

Upload your drawings and receive a scoped quote within 2 hours. No commitment required.