Construction Estimating Services Built for US Projects
DELIVERED IN 48 HOURS
Professional quantity takeoffs, bid proposals, and cost budgets for US contractors and developers backed by RS Means data, CSI formatting, and a 98% bid-accuracy guarantee.
✓ 98% Bid Accuracy
✓ 24-48 Hr Delivery
✓ RSMeans Benchmarked
✓ CSI MasterFormat
✓ NDA Available
✓ USD Pricing
Core Services
Four Ways We Support Your Projects
📐
Quantity Takeoff
Precise material counts from any drawing format — PDF, DWG, Revit. Covering structural, architectural, MEP, and finishes. Output: Excel BOQ with CSI division breakdown and measurement backup sheets.
Formate
PDF · DWG · RVT · XLS
Delivery
24–48 Hours
Output
Excel + PDF BOQ
💰
Bid Proposal Preparation
Complete RFP-ready bid packages: cover letter, scope clarifications, unit-rate schedule, labor + material breakdown, exclusions list, and alternates. Reviewed against the RFP specifications before delivery.
Formate
PDF RFP · Drawings
Delivery
48-72 Hours
Output
Word + Excel Package
🏗️
Pre-Construction Cost Budgeting
Progressive cost estimates from conceptual (±20%) through design development (±10%) benchmarked to RS Means city cost indices. Includes system-level breakdown, contingency recommendation, and value-engineering options.
Phases
SD · DD · CD · GMP
data source
RS Means + Local
Output
Excel Budget Report
📅
Project Scheduling (CPM)
Baseline CPM schedules, look-ahead programmes, and recovery schedules for construction projects of all scales. Linked to BOQ activities with resource loading. Output in MS Project, Primavera P6, or PDF Gantt.
Tools
MS Project · P6
Delivery
48-96 Hours
Output
.MPP · .XER · PDF
How it Works
4 Step Process - Start to Delivery
① Upload Drawings
PDF, DWG, Revit accepted
② Get Quote (2 hrs)
Fixed-price scope confirmation
③ We Estimate
Using RS Means & local data
③ We Estimate
24–48 hrs, Excel + PDF
| PROJECT STAGE | QUANTITY TAKEOFF | BID PROPOSAL | COST BUDGET | SCHEDULE |
|---|---|---|---|---|
| Pre-Design / Feasibility | — | — | ✓ | — |
| Design Development | ✓ | — | ✓ | ✓ |
| Bid / Tender Stage | ✓ | ✓ | — | — |
| Construction Phase | — | — | — | ✓ |
Not sure which service you need?
Upload your drawings and tell us your deadline — we’ll recommend the right service and scope it for free.